LNG Ship Loading: Environmental Impact Assessment

Canaport LNG has received a permit to allow LNG to be taken from the terminal’s storage tanks and re-loaded onto LNG tankers to be shipped to other markets.

The terminal is furnished with the necessary equipment to re-load ships and no additional construction or modification is required. All existing operation procedures and safety processes will remain the same, but the flow of LNG will be reversed when loading a tanker.
 

For more information, please download the Canaport LNG Ship Loading Environmental Impact Assessment document.